Project Name M-DCPS MASTER Nov. 2014
Project No. SPECIFICATION GUIDELINES 13745 − 15
B. After M-DCPS initial testing approval, a continuous 30 calendar day period of trouble-free
operation is required before system acceptance.
3.5 DEMONSTRATION
A. After system has been tested, checked, and certified as complete and operational,
technician shall demonstrate various functions and operations of system to A/E and M-
DCPS maintenance and administrative staff.
B. Demonstrate and explain system functions and operations in detail to school personnel
designated by the school’s principal.
C. Furnish a minimum of 8 hours or as needed to provide adequate in-service training with
this system. These sessions will be broken into segments to facilitate the training of
individuals in operating station equipment, administrative devices, user programming
functions, and program distribution equipment. Operating manuals and user's guides shall
be provided at training sessions.
D. Provide all school staff participating in the in-service training with hand-out material
providing basic knowledge of system operation.
E. Training for software updates to the program (via serial port or Ethernet) by an "allowed"
programming instrument, shall be given to personnel designated by M-DCPS in making
these updates to the restriction tables.
3.6 EXISTING BUILDINGS
A. Existing intercom and clock systems replaced with a new intercom and clock system
installation shall have existing panels, sub-panels, power supplies, speaker/clock
assemblies, and any other non-operational component removed after the new intercom
and clock system certificate of completion is accepted by M-DCPS.
END OF SECTION